Tel: 01223 499488
Follow the links below for instant access to technical information on the following:
Payback is often less than 1 year due to labour saving, production increase, reduced HR.
Typically +40% due to: no holidays or breaks, forced takt time, longer working hours, faster speeds etc.
H&S claims reduced to zero as all manual handing is now done by the robotic palletiser.